PayPerSqft

Warehouse construction in Bangalore, ready in 30–45 days

₹790/ sq ft turnkey · up to 10,000 sq ft
  • Structure, flooring & toilets included
  • Handed over in 30–45 days
  • Free site visit & layout
  • Across all of Bangalore

Get a construction quote

Free site consultation · no obligation

Step 1 of 2
  1. Your project
  2. Contact
sq ft
The land

What is it for?

We build for India's leading quick-commerce & logistics brands

  • Zepto
  • Blinkit
  • Swiggy Instamart
  • BigBasket
  • Flipkart Minutes
  • Amazon Now
  • DHL
  • FedEx
Flat turnkey rate up to 10,000 sq ft
₹790 /sq ft
From mobilisation to handover
30–45 days
Clear height, standard spec
20 ft
Tiled block, tank & sump included
3 toilets

Pricing

Warehouse construction cost in Bangalore

One flat turnkey rate of ₹790 per sq ft for warehouses up to 10,000 sq ft — structure, civil work, flooring, toilets and utilities to our standard specification. Above 10,000 sq ft we quote for your site.

Warehouse construction cost by size in Bangalore
Warehouse sizeTurnkey cost
2,500 sq ft₹19.75 lakh (₹19,75,000)
5,000 sq ft₹39.5 lakh (₹39,50,000)
7,500 sq ft₹59.25 lakh (₹59,25,000)
10,000 sq ft₹79 lakh (₹79,00,000)
Above 10,000 sq ftCustom quote for your site

Final quote after a site visit — it can vary with site condition, access and customisation.

sq ft
1,00010,00020,000 sq ft

Turnkey construction cost

₹39.5 lakh

5,000 sq ft × ₹790/sq ft = ₹39,50,000

  • Structure & roofing
  • Foundation & plinth
  • VDF / PU flooring
  • Toilet block
  • Sump & overhead tank
  • Parking & approach

Indicative, for our standard specification. Final quote after a site visit.

Specification

What's included in ₹790/sq ft

A complete, move-in-ready warehouse — engineered for durability and day-to-day operations. Layout and quantities are fitted to your plot.

Standard PayPerSqft warehouse specification: insulated GI roof with turbo ventilators and rolling shutters, clear-span interior, landscaped side access, toilet block with overhead tank, DG platform and rider shelter
Our standard specification: insulated roof with turbo vents and rolling shutters, clear-span interior, toilet block with overhead tank, DG platform and rider shelter.

Structure

  • 20 ft clear height, 6×6 ft pillar grid
  • GI roofing, insulated, with 4 turbo ventilators
  • Plastered side walls, minimum 6 ft
  • 2 rolling shutters with locks and canopy
  • DG platform and riders’ canopy / seating
  • Full paint finish on walls and structure

Civil work

  • RCC columns on stone bedding and foundation
  • Reinforced plinth with steel rods
  • Dust-free VDF / PU flooring, or vitrified tiles (optional)
  • ~2,000 sq ft parking — fits 100 two-wheelers
  • Concreted entrance and approach road
  • Water inlet, drain outlet and drainage

Toilets & utilities

  • 3 toilets — 2 inside (male / female) + 1 outside
  • Fully tiled, RCC roof slab, PVC doors
  • Western commodes, urinal and washbasins
  • 1,000 L overhead tank with motor
  • 10,000 L+ sump with steps and cover
  • Complete plumbing, drainage and wiring

A detailed, itemised specification comes with every quote.

Timeline

From empty plot to handover in 30–45 days

A fixed, phase-by-phase schedule for warehouses up to 10,000 sq ft, so you can plan your launch.

  1. 1

    Mobilisation & layout markingDays 1–3

    Site set-up, material procurement, marking for columns, shutters and toilets.

  2. 2

    Foundation, plinth & columnsDays 4–12

    Stone bedding, foundation, reinforced plinth and column erection to the structural design.

  3. 3

    Structure, roofing & wallsDays 13–25

    Pillars, insulated GI roofing with turbo vents, side walls and rolling shutters.

  4. 4

    Flooring, toilets & utilitiesDays 26–36

    VDF / PU or tiled floor, toilet block, plumbing, tank, sump and drainage.

  5. 5

    Finishing & handoverDays 37–45

    Painting, canopy, DG platform, parking, final quality checks and handover.

Subject to site access and utility approvals. Larger builds get their own schedule with the quote.

What we build

Warehouses and industrial sheds for every kind of business

Racked logistics warehouse interior with pallet storage in Bangalore

Logistics & 3PL warehouses

Clear-span storage for racking, pallets and fast inbound / outbound — built around your layout.

Empty industrial shed with steel structure and polished concrete floor

Factory & industrial sheds

Open sheds for light manufacturing and assembly, with the power and access your process needs.

Dark store interior with glass-door fridges for quick commerce

Dark stores & quick commerce

Ground-floor stores with wide shutters, rider parking, DG backup and toilets — and we can find the operator.

Dark store leasing →

Distribution warehouse with pallet racking and a forklift

Distribution, FMCG & godowns

Distribution centres and godowns for FMCG, e-commerce and retail, including cold-chain-ready shells.

Why PayPerSqft

Why businesses in Bangalore build with us

One flat, transparent rate

₹790/sq ft up to 10,000 sq ft for the full specification — no hidden extras.

Handed over in 30–45 days

A fixed, phase-by-phase schedule so you can plan your launch date.

A-grade, built for operations

Engineered structure, dust-free flooring and finished toilets that hold up to daily use.

We can find the tenant too

Building to lease? We match your warehouse with logistics and quick-commerce tenants.

Building to lease it out? We can line up a tenant before handover.

Find your space

No land yet? Tell us your requirement.

We search for land that suits a warehouse in the areas you name, or find a ready-to-move or built-to-suit space if you would rather lease.

Post your requirement →

We call within 24 hours

Across Bangalore

Warehouse construction across Bangalore

We build in every part of the city — with particular strength in the East Bengaluru logistics corridors of Whitefield, Varthur, Sarjapur Road and Hoskote.

East Bangalore

  • Whitefield
  • Marathahalli
  • KR Puram
  • Mahadevapura
  • Brookefield
  • Varthur
  • Kadugodi
  • Hoskote
  • Old Airport Road
  • Indiranagar

South-East Bangalore

  • Sarjapur Road
  • Bellandur
  • HSR Layout
  • Koramangala
  • Electronic City
  • Hosur Road
  • Bommanahalli
  • Attibele
  • Chandapura

North Bangalore

  • Hebbal
  • Yelahanka
  • Hennur
  • Thanisandra
  • Jakkur
  • Devanahalli
  • RT Nagar
  • Kalyan Nagar

South & West Bangalore

  • JP Nagar
  • Jayanagar
  • Banashankari
  • Kanakapura Road
  • Bannerghatta Road
  • Rajajinagar
  • Vijayanagar
  • Yeshwanthpur
  • Peenya
  • Mysore Road

Warehouse construction questions

How much does warehouse construction cost in Bangalore?

For warehouses up to 10,000 sq ft our turnkey rate is a flat ₹790 per sq ft — structure, civil work, flooring, toilets and utility connections to our standard specification. A 5,000 sq ft warehouse therefore costs about ₹39.5 lakh and a 10,000 sq ft one about ₹79 lakh. Larger warehouses get a custom quote based on scale, site conditions and any additional specifications.

What is included in the ₹790/sq ft package?

The full structure (insulated GI roofing with turbo ventilators, pillars, side walls, two rolling shutters, canopy), civil work (foundation, reinforced plinth, VDF / PU or vitrified tile flooring, parking, approach road, drainage) and a tiled toilet block with plumbing, overhead tank and sump. It is a complete, move-in-ready shell for warehousing, logistics and light industry.

How long does it take to build a warehouse?

Most warehouses up to 10,000 sq ft are handed over in 30–45 days from mobilisation, provided the site is accessible and approvals and utility connections are in place. The work runs in five phases — set-up, foundation and columns, structure and roofing, flooring and utilities, then finishing and handover.

Do you build warehouses larger than 10,000 sq ft?

Yes. Above 10,000 sq ft we price the build for your site — layout, loading docks, mezzanine or racking needs and site conditions. Share your requirement and we will come back with a detailed quote and timeline.

What does A-grade warehouse construction mean?

RCC and steel structural framing to standard engineering specifications, insulated GI roofing with proper ventilation, plastered and sealed walls, dust-free VDF, PU-treated or vitrified tile flooring, and fully finished toilet blocks — built for continuous, high-throughput operations.

What kinds of warehouses do you build?

Logistics and 3PL warehouses, factory and industrial sheds, distribution centres and godowns, cold-chain-ready shells for FMCG, and quick-commerce dark stores. The layout and quantities are planned around how your team will actually use the space.

Do you handle approvals and utility connections?

We coordinate the water inlet and drain outlet, drainage to the municipal connection or an earth pit, and site-level documentation as part of the build. Electrical connections are scoped separately based on your power load.

Which parts of Bangalore do you build in?

All of Bangalore, with particular strength in the East Bengaluru corridors — Whitefield, Varthur, Sarjapur Road and Hoskote — as well as the North (Hebbal, Yelahanka, Devanahalli), South-East (Electronic City, Hosur Road, Attibele) and West (Peenya, Mysore Road) industrial belts.

I have land but no tenant yet. Can you help?

Yes. Besides building the warehouse, we match landowners with logistics, 3PL and quick-commerce tenants — so the warehouse can be leased out soon after handover. Tell us in the quote form that you are building to lease.

Free site visit · No obligation

Get your warehouse built in 45 days

Tell us where the site is and the size you need. We'll call within 24 hours and share a quote with the full specification.

Have a property to rent out or sell? Add your property

What happens next

  1. Today · 1 minute

    Share the site and size

    Where the land is, the built-up area you need and what it’s for.

  2. Within 24 hours

    We call, then visit the site

    We look at access and utilities on site, and plan the layout with you.

  3. Then

    Quote with the full specification

    The detailed specification and timeline in writing before anything starts.

  4. 30–45 days

    Built and handed over

    Built to the agreed schedule and handed over ready to use.